Hotels, Restaurants
and Tasting Rooms, Planned to Your Opening Date
Kerh Architecture designs hotels, restaurants, winery tasting rooms, cafés and boutique stays in Kelowna and across the Okanagan. We plan each one around the numbers your business runs on: seat count, key count and opening date. Most restaurants and tasting rooms are assembly occupancies under Part 3 of the BC Building Code. Occupant load sets your exits and washroom counts, and building size decides whether you need sprinklers. We confirm all of it before you sign the lease. Then we lead the consultant team through the building permit and Interior Health approval to opening day.
From a single café fit-out to a winery tasting room or a boutique hotel, we design spaces that move guests smoothly and give staff a kitchen and back-of-house that work under pressure. We coordinate your kitchen designer, mechanical and fire engineers, and the City’s building and fire review, so nothing waits on someone else’s drawings. Your opening date is the plan we build every stage and task around.
Why Choose Kerh for Your Hospitality Project?
Brand Standards
Meet BC Code
Franchise prototypes are usually written to US codes. We reconcile them to the BC Building Code, BC accessibility rules and the Energy Step Code early, when it costs the fewest keys. Winery projects get the same care with Agricultural Land Reserve limits.
Opening Dates We
Plan and Hold
Your project is planned stage by stage and task by task in our practice management system, working back from opening day. Building permit, Interior Health and liquor licensing drawings run in parallel, and you get a weekly snapshot of what moved and what’s at risk.
Proactive
Project Management
We plan approvals, consultant deliverables and long-lead equipment before they turn into delays. Your kitchen designer, engineers and the City work through one point of contact, and you hear about risks early, with options. Many hospitality clients prefer their projects stay private, and we work that way from the first call.
Our Hospitality Process:
Six Steps to Opening Day

Step 1
Site & Lease Feasibility
We review zoning, the existing building and any change-of-occupancy upgrades before you sign. You get a realistic seat or key count and a clear list of the work the space will need.

step 2
Concept & Guest Experience
We work through your menu, service style and brand to set how the space should look and run. That brief fixes the seat count, bar and kitchen size before any layout is drawn.

step 3
Layout Options
We prepare two to three floor plans for the space. Each one is compared on seat or key count, kitchen and service flow, accessibility and build cost.

step 4
Consultant Coordination
Your kitchen designer and the mechanical, electrical and fire protection engineers join early. Exhaust hoods, grease interceptors and sprinklers are fixed in the plan before finishes are chosen.

step 5
Detailed Plans & Visuals
We produce renderings for investors, franchisors and branding. The coordinated drawing set then goes out for contractor pricing and tender.

step 6
Permits, Licensing & Opening
We submit the building permit and prepare the drawings for health and liquor licensing. Planned field reviews follow construction through to opening day.
Ready to Begin?
Found a space, or comparing a few? Start with a free 20-minute call. Bring the address and your target seat or key count, and we’ll follow up with a written proposal for a feasibility review.
Questions
Before You Sign
Question 1
Can you tell me how many seats or keys a site will hold before I sign?
Yes. Our feasibility review sets a realistic occupant load from zoning, exits, washrooms and the existing building, so the number in your business plan is one the City will approve. If the space falls short, we show you what it would take to get there, such as an added exit or washroom, so you can negotiate it into the lease.
Question 2
Can you adapt our brand’s prototype to BC code?
Yes. We reconcile franchise prototypes to the BC Building Code, BC accessibility rules and the Energy Step Code early, when it costs the fewest keys. Each change is documented against the brand standard, so the franchisor can review and approve it in one pass.
Question 3
Who handles Interior Health and liquor licensing drawings?
We do. We prepare the drawings and coordinate the Interior Health food premises review and liquor licensing alongside the building permit, so one approval doesn’t hold up the next. Kitchen layout, finishes, hand sinks and patron capacity are shown the way each reviewer expects, which cuts down on resubmissions.
Question 4
How do you protect our opening date?
Your project is planned stage by stage and task by task in our practice management system, working back from opening day. We review all active projects together in one overview, and you get a weekly snapshot of what moved and what’s at risk. When something slips, such as a long-lead hood or a slow review, you hear about it early with options to recover the date.
Question 5
Can you work confidentially?
Yes. Many of our hospitality clients prefer their projects stay private, and we’re comfortable working under an NDA from the first call. Project details, drawings and renderings are never shared or published without your written permission.
Please note: The information on this page is general and for educational purposes only. It is not professional advice for your property or project, and reading it does not create a client relationship with Kerh Architecture Inc. Every project is unique: codes, bylaws and licensing requirements change, and how they apply depends on a review of your specific site, building and goals. Approvals, timelines and capacities are decided by the authorities having jurisdiction, such as the City, Interior Health and other agencies, and cannot be guaranteed. Please consult us or another qualified professional before making decisions about property, leases, financing or design. Our professional services begin only under a signed client-architect agreement.